Road Delays
By: KSAN News Staff
Updated: June 22, 2007
The 3.8 mile stretch of Paint Rock Road located between US-Highway 87 and Loop 306 will be under construction. The 1.8 mile section on Loop 378, between FM-1223 and US-Hwy 87 will also be affected.
If you are planing on traveling along these roadways this friday and saturday, be prepared for significant delays.

